Project 627A Kit

Project 627A

NATO: November

Project 627

Project 627
Type SSN
Soviet designation PLA
NATO reporting name November
Country USSR
Displacement (t) 4,096
Length (m) 107.3
Beam (m) 7.9
Draft (m) 5.7
Height (m) 7.9
Max speed submerged (kn) 30.0
Max speed surfaced (kn) 15.2
Max safe depth (m) 241
Endurance (days) 60
Propeller 2 x 6 bladed propellers
Nuclear reactors 2
Titanium hull No
Class year 1959

Sensors

Sonar (5)

Name Type Platform Passive range (km) Active range (km)
Luch Mine detection sub — 0.7
Mars-16KP Hull sub 0.4 —
MG-13 Svet Active Intercept — —
MG-200 Arktika Hull sub — 1.3
NEL-6 Echo sounder sub — —

Radar (3)

Name NATO name Air search Surface search Fire control
ARP-53 — — —
MRP-10 Nakat — — —
Prizma — Yes —

Launchers (2)

Name Tubes Fire control Max launch depth (m)
533mm Torpedo Tube (forward) 8 Toriy 100
Signal Ejector 2 — 100

Extendable devices (7)

Name NATO name Capabilities Max depth (m) Max speed (kn)
ARP-53 RDF — Direction finder — 7.5
MRP-10 Nakat ESM — ESM — 7.5
PR-12 attack periscope — Periscope (attack) — 7.5
PZN-9 search periscope — Periscope (observation) — 7.5
Radar — Radar — 7.5
RDP — Snorkel — 7.5
VAN Radio antenna — Radio (LF, MF, HF), Radio navigation — 7.5

Individual hulls (1)

Name Short name Country Start date End date Remark
K-3 K-3 USSR 1958-12-17 (Commissioned) 1959-12-01 (Modernization (equivalent as Project 627A))