Project 659

NATO: Echo I

Project 659

Project 659
Type SSGN
Soviet designation PLARK
NATO reporting name Echo I
Country USSR
Displacement (t) 5,500
Length (m) 111.2
Beam (m) 9.2
Draft (m) 7.1
Height (m) 9.2
Max speed submerged (kn) 24.1
Max speed surfaced (kn) 15.1
Max safe depth (m) 241
Endurance (days) 50
Propeller 2 x 6 bladed propellers
Nuclear reactors 2
Titanium hull No
Navigation system Pluton-659 (Automatic Dead Reckoning)
Class year 1961

Sensors

Sonar (7)

Name Type Platform Passive range (km) Active range (km)
MG-10 Kola Cylindrical sub 0.9 —
MG-13 Svet Active Intercept — —
MG-15 com sub — —
MG-200 Arktika Hull sub — 1.3
MG-23 Beresta-M ssp — —
NEL-6 Echo sounder sub — —
Plutoniy Hull sub — 0.9

Radar (3)

Name NATO name Air search Surface search Fire control
ARP-53 — — —
MRP-10 Nakat — — —
RLK-101 Albatros Snoop Tray 1 — Yes —

Launchers (5)

Name Tubes Fire control Max launch depth (m)
400mm Torpedo Tube (forward) 2 Leningrad-659 250
400mm Torpedo Tube (aft) 2 Leningrad-659 250
533mm Torpedo Tube (forward) 4 Leningrad-659 100
Missile Launcher 6 Sever-A659U 0
  • 1962 - present: 6 x P-5
VIPS 2 — 200

Extendable devices (10)

Name NATO name Capabilities Max depth (m) Max speed (kn)
ARP-53 RDF — Direction finder — 7.5
Attack periscope — Periscope (attack) — 7.5
Bow hydroplanes — Bow hydroplanes — 7.5
Graphite-1 Radio antenna — Radio (VHF) — 7.5
Iskra-1 Radio antenna — Radio (LF, MF, HF), Radio navigation — 7.5
MRP-10 Nakat ESM — ESM — 7.5
PR-14 Astrocorrector — Periscope (astro) — 7.5
PZNG-10 Search periscope — Periscope (observation) — 7.5
RDP — Snorkel — 7.5
RLK-101 Albatross Radar — Radar — 7.5

Individual hulls (5)

Name Short name Country Start date End date Remark
K-122 K-122 USSR 1962-07-06 (Commissioned) 1972-04-12 (Convert to Project 659T)
K-151 K-151 USSR 1963-07-28 (Commissioned) 1973-05-10 (Convert to Project 659T)
K-45 K-45 USSR 1961-06-28 (Commissioned) 1969-03-05 (Convert to Project 659T)
K-59 K-59 USSR 1961-12-16 (Commissioned) 1970-04-20 (Convert to Project 659T)
K-66 K-66 USSR 1961-12-28 (Commissioned) 1971-05-15 (Convert to Project 659T)